This project has been approved by relevant departments and included in the 2010 investment plan. The main construction content of the project is to reinforce and thicken the dams of four small and dangerous reservoirs within the scope of Gaoyao City, repair or construct flood control roads, repair or rebuild spillways, and construct or rebuild water culverts. The total investment of the project is approximately xxx million yuan, and the planned construction period is xxx calendar days.
1、 Registration requirements
An independent legal entity with a third level or higher qualification for general contracting of water conservancy and hydropower engineering construction and a construction safety production license that has passed the annual review.